Quantcast
Channel: RFPMart - Nevada RFPs
Viewing all articles
Browse latest Browse all 3150

MRB-30046 - USA (Nevada) - Strategic Infrastructure Plan Services - Deadline January 11,2023

$
0
0
Posted Date : December 01,2022
Product (RFP/RFQ/RFI/Solicitation/Tender/Bid Etc.) ID : MRB-30046
Government Authority located in Nevada; USA based organization looking for expert vendor for strategic infrastructure plan services.
[A] Budget: Looking for Proposal
[B] Scope of Service:
(1) Vendor needs to provide strategic infrastructure plan services.
1. All design elements, equipment, specifications, plans, schedules, and recommendations shall adhere to UNLV standards and guidelines.
2. All design elements, equipment, specifications, plans, schedules, and recommendations shall adhere to applicable codes and regulations, including, but not limited to, those of the State of Nevada and Clark County jurisdictions
3. Evaluate facility schedules and utility consumption data to determine the boiler, chiller, and cooling tower capacities necessary to meet present and projected loads.
4. Provide analysis of infrastructure and utilities options including, but not limited to, standard and alternative options for boilers, chillers, cooling towers, and thermal storage for each Campus.
5. Provide a strategic infrastructure plan schedule including all aspects of the strategic plan with 5, 10, 15, and 20-year benchmarks for asset additions, major repairs and replacements, and load projections for each Campus.
6. Provide budget cost estimates with the strategic infrastructure plan schedule including
estimated costs of initial and periodic capital projects, annual operations and maintenance,
annual energy consumption and expenditures for electricity and natural gas, annual water
consumption and cost, a GIS utility mapping program, and periodic repairs and replacements
included in the strategic infrastructure plan created during this project for each Campus.
7. The Strategic Infrastructure Plan shall include diagrams of existing and proposed new plants and maps of utility distribution systems illustrating the plan in phases at 5, 10, 15, and 20 years for each Campus.
8. Provide recommended standards and specifications documents for utility plant equipment, piping distribution systems, and building entrance metering and piping arrangements for each Campus.
9. Provide estimates of staff requirements at each interval, 5, 10, 15, and 20 years, including skill sets and number of full-time equivalent employees required to operate and maintain the new strategic infrastructure and utilities in the plan for each Campus.
10.Provide a complete set of documents comprising a comprehensive Strategic Infrastructure Plan. Drawings and all other Strategic Infrastructure Plan documents shall be provided in electronic format before final completion and billing for each Campus.
(2) A pre proposal meeting will be held on December 9, 2022.
(3) All question must be submitted no later than December 21, 2022.
[C] Eligibility:
- Onshore (USA Organization Only);
[D] Work Performance:
Performance of the work will be Offsite. Vendor needs to carry work in their office location.
Budget :
Deadline to Submit Proposals: January 11,2023
Cost to Download This RFP/RFQ/RFI/Solicitation/Tender/Bid Document : 5 US$

Viewing all articles
Browse latest Browse all 3150

Trending Articles