(1) Vendor needs to provide construction manager at risk services to the government authority located in Las Vegas, NV.
- Pre-construction for the HVAC upgrades and cosmetic improvements.
- Services shall include but is not limited to door and hardware replacement; flooring replacement; ceiling and lighting replacement; wholistic replacement of the HVAC system to VAV and airflow controls; chiller replacement; boiler replacement; DDC controls; fa upgrades as required; and data wire upgrades.
(2) A mandatory site visit will be on February 21, 2023.
(3) All the questions must be submitted no later than March 02, 2023.
↧