(1) Vendor needs to provide upgrade video surveillance system supplies include DVR, monitor, matrix switch, translator, distribution amp, power supply, fixed analog camera to the government authority located in Las Vegas, NV.
- For the removal, inventory, packaging for storage and return of all removed ccv equipment. All currently installed wire, cable, and fiber shall be completely removed by the contractor and properly disposed of.
- The existing system shall remain fully functional and operational to the extent possible during the installation of the new surveillance system. The contractor shall cut over from the existing system to the new system in stages in order to minimize the number and duration of outages.
- Include all connectors, adapters, terminators, and appurtenances to interconnect all equipment. The contractor shall also supply all cabling and miscellaneous materials necessary to interconnect all equipment installed.
- The contractor shall provide a daily access schedule to coordinate installation activities. The schedule shall be submitted as part of the project plan.
- The contractor shall maintain a separate set of drawings, schematics, and wiring diagrams to be used for creating as-built drawings. This set shall be accurately kept up to date by the contractor, noting all changes and additions and shall be available for the final inspection walkthrough.
- The contractor may be required to attend installation construction meetings.
(2) The contract period will be for three year.
(3) All the questions must be submitted no later than June 2, 2023.
(4) A site visit will be held on May 31, 2023.
↧