(1) Vendor needs to provide certified environmental manager and qualified environmental professional services to the government authority located in Las Vegas, NV. – Assisting with a community “kick–off” meeting to explain the project and schedule of activities to the citizens of Las Vegas (Lead City with CEM/QEP)– Confirming the assumptions of the Clean–up Plan (CEM/QEP and EPA)– Coordinating with EPA and NDEP as needed. (City and CEM/QEP)– Translating the Clean–up Plan into a clear scope of work to be incorporated into the Clean–up Bid and Contract documents. (CEM/QEP)– Submitting and obtaining approval of a Quality Assurance Project Plan (QAPP)– “Pre–excavation” assessment activities such as preparation of a site–specific sampling and analysis plan, pre–excavation site assessment, analysis plan, development of a health and safety plan, preparation of a site–specific soil management plan, preparation of a stormwater pollution prevention plan, preparation of a Sect. 106 study, and development of a dust mitigation plan,– Oversight of the remediation and closeout reporting.– Estimated contract costs for soil removal and disposal.(2) All questions must be submitted no later than August 15, 2024
↧