Quantcast
Channel: RFPMart - Nevada RFPs
Viewing all articles
Browse latest Browse all 3160

US-FED-00000220779 - Carolyn Creek Trail Bridge Project (GAOA) - Deadline August 6,2024

$
0
0
Title: Carolyn Creek Trail Bridge (GAOA)The contractor shall provide all materials, labor, equipment, tools, transportation, supervision, expertise, and other incidentals necessary, except as otherwise provided, to successfully complete this project.Forest: Humboldt–Toiyabe National Forest – Bridgeport RangerScope of Work: This project consists of design (taking the government drawings to a fabricator and having them do shop drawings), purchasing, delivering and installing a 27–foot span glulam timber trail bridge with metal railing. The site is roughly one mile up a hiking trail and may require the use of a helicopter for transport. In this case, the contractor would be responsible for coordinating the weight of the various bridge components with the available helicopter. The existing bridge will be removed and disposed of. All nonnative components must be removed from the forest.All work

Viewing all articles
Browse latest Browse all 3160

Trending Articles