(1) Vendor needs to provide concourse development service to the government authority located in Reno, NV.– The contractor shall carefully study and compare all plans, drawings, details and specifications and other instructions and shall at once report any error, inconsistency or omission which contractor or as subcontractor may discover.– Provide for construction and completion, in every detail, of the work described.– Use such material in another contract item, providing such use is approved.– The architect or engineer and is in conformance with the contract specifications applicable to such use.– Remove such material from the site, upon written approval of the architect or engineer.(2) All the questions must be submitted no later than April 21, 2025.(3) The contract period will be for one year.(4) Pre–proposal meeting will be held on April 18, 2025.
↧